[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-xinchuang-adapter-cost-en":3,"blog-adjacent-xinchuang-adapter-cost-en":29,"blog-related-xinchuang-adapter-cost-en":64},{"id":4,"slug":5,"title":6,"excerpt":7,"content":8,"cover":9,"tone":10,"author":11,"publishedAt":12,"updatedAt":12,"readingMinutes":13,"featured":14,"tags":15,"category":19,"seoSettings":28},113,"xinchuang-adapter-cost","The Real Cost of Xinchuang Adaptation","Migrating to domestic hardware and software costs more than the quote; half of it hides in details.","\u003Cp>We have joined several Xinchuang projects in recent years covering domestic operating systems, databases and middleware. Quotes cover adaptation effort, but the real cost structure is bigger. Notes on the underestimated parts.\u003C\u002Fp>\n\u003Ch2>Three underestimated areas\u003C\u002Fh2>\n\u003Cp>Drivers and peripherals. Printers, scanners and card readers may lack drivers, and finding replacements takes far longer than expected.\u003C\u002Fp>\n\u003Cp>SQL compatibility. Domestic databases differ on complex queries, procedures and functions, forcing extensive rewrites.\u003C\u002Fp>\n\u003Cp>Performance tuning. Some components perform noticeably worse on identical hardware and need extra tuning cycles.\u003C\u002Fp>\n\u003Ch2>Estimating more reliably\u003C\u002Fh2>\n\u003Cp>Split the work into four buckets: environment migration, code adaptation, tuning, and training, each with buffer.\u003C\u002Fp>\n\u003Cp>Run one complete small-scope migration sample and calibrate the whole estimate against measured data, not vendor reports.\u003C\u002Fp>\n\u003Cp>Reserve a dual-running period of a year or more, especially for core systems.\u003C\u002Fp>\n\u003Cp>Xinchuang adaptation is a long shakedown, not a swap. Only honest costing gets the project actually done.\u003C\u002Fp>","","slate","佳益方圆团队","2026-08-10T14:05:00+08:00",1,false,[16,17,18],"Industry Watch","Xinchuang","Migration",{"id":20,"parentId":21,"slug":22,"name":16,"description":23,"icon":24,"cover":9,"tone":25,"kind":26,"sortOrder":27,"count":21},5,0,"industry-watch","In-depth analysis of internet, software and digital industry trends with our own point of view.","globe","blue","article",20,{},{"previous":30,"next":47},{"id":31,"slug":32,"title":33,"excerpt":34,"content":9,"cover":9,"tone":25,"author":11,"publishedAt":35,"updatedAt":35,"readingMinutes":13,"featured":14,"tags":36,"category":40},94,"tech-sharing-day","A Quarterly Tech Sharing Day","Thirty minutes a week is not always enough, so we take half a day, mute notifications and talk shop properly.","2026-08-12T14:05:00+08:00",[37,38,39],"Team Culture","Knowledge Sharing","Organisation",{"id":41,"parentId":21,"slug":42,"name":43,"description":44,"icon":45,"cover":9,"tone":25,"kind":26,"sortOrder":46,"count":21},4,"team-culture","Team and Culture","Company events, tech sharing, team building and hiring culture that show the daily life of the Jiayifangyuan team.","users",30,{"id":48,"slug":49,"title":50,"excerpt":51,"content":9,"cover":9,"tone":25,"author":11,"publishedAt":52,"updatedAt":52,"readingMinutes":13,"featured":14,"tags":53,"category":57},15,"retro-of-a-failed-project","A Full Post-Mortem of a Project We Should Not Have Taken","Vague requirements, seven decision makers and a budget nowhere near the expectation. The project failed in slow motion.","2026-08-08T14:05:00+08:00",[54,55,56],"Startup","Failure","Retrospective",{"id":58,"parentId":21,"slug":59,"name":60,"description":61,"icon":62,"cover":9,"tone":25,"kind":26,"sortOrder":63,"count":21},6,"founder-notes","Founder Notes","Reflections from the founding team on business, management and product, documenting the growth of a software company.","pen-tool",10,[65,75,85],{"id":66,"slug":67,"title":68,"excerpt":69,"content":9,"cover":9,"tone":10,"author":11,"publishedAt":70,"updatedAt":70,"readingMinutes":13,"featured":14,"tags":71,"category":74},108,"gansu-manufacturing-digitalization","Three Observations on Manufacturing Digitalisation in Gansu","After visiting a dozen local manufacturers, digitalisation is less about buying software than filling foundations.","2026-10-09T09:00:00+08:00",[16,72,73],"Manufacturing","Digitalisation",{"id":20,"parentId":21,"slug":22,"name":16,"description":23,"icon":24,"cover":9,"tone":25,"kind":26,"sortOrder":27,"count":21},{"id":76,"slug":77,"title":78,"excerpt":79,"content":9,"cover":9,"tone":25,"author":11,"publishedAt":80,"updatedAt":80,"readingMinutes":13,"featured":14,"tags":81,"category":84},109,"local-software-budget","Two New Trends in Local Software Budgets","Totals are flat, but the way money is spent has changed: fewer big one-off projects, more sustained investment.","2026-09-27T10:13:00+08:00",[16,82,83],"Budget","IT Strategy",{"id":20,"parentId":21,"slug":22,"name":16,"description":23,"icon":24,"cover":9,"tone":25,"kind":26,"sortOrder":27,"count":21},{"id":41,"slug":86,"title":87,"excerpt":88,"content":9,"cover":9,"tone":89,"author":11,"publishedAt":90,"updatedAt":91,"readingMinutes":13,"featured":14,"tags":92,"category":95},"cross-border-first-90-days","The First 90 Days of Going Global: Storefront, Payments and Fulfillment","Having an English website is only the beginning. What really decides the first 90 days is payments, compliance and delivery experience beyond the storefront.","cyan","2026-09-18T10:30:00+08:00","2026-10-18T15:58:14.692+08:00",[93,94],"Going Global","Cross-Border Commerce",{"id":20,"parentId":21,"slug":22,"name":16,"description":23,"icon":24,"cover":9,"tone":25,"kind":26,"sortOrder":27,"count":21}]