Retrospective: A Month Lost to Missing Documentation

The core developer left and the successor spent a month before daring to change a line.

The system had run stable for two years when the core developer resigned. Handover lasted two weeks, and the successor spent the first month reading code and guessing intent. A small client request took ten days to reach production.

What was missing

Why things were built that way. Several odd behaviours existed for a specific client requirement years earlier.

Which data must not be touched. Some tables are written by external systems, and manual edits break synchronisation.

The deployment procedure lived in one head: which servers, which scheduled jobs, which environment variables.

Our handover checklist now

Each core member maintains a system note with architecture diagrams, key decisions and common incident playbooks.

Deployment and rollback are scripts, so anyone can follow the document and release.

Handover starts at least a month before departure, and the successor performs one release alone.

People move on. Whether a system keeps running after anyone leaves is the real measure of team maturity.

Back to blog

Want to apply these ideas to your project?

We are happy to go deeper into implementation details, or to discuss the specific questions you are facing.

Start a conversation →
— The editors at JiayifangyuanEST. 2019 · JYFY